Bollman Technical Education Center

9451 Washington Street, Thornton, CO, 80229 - 720-972-5820 - Website
Bollman Building 2016
Project rating - 1 $3.9-$4.6M
Project rating - 1

Bond Passed - You did it! Thanks to your support, on Nov 8 the $350 million bond passed and will benefit every student, every school and every community.

Latest Updates

The 2016 Bond Program provides every school with funding for needed building improvements. See below for Bollman Tech's specific construction timeline of projects. 

*To ensure the bond program provides significant investments in every student, every school and every community, the Five Star District used six primary considerations to determine the timeline of districtwide and school-by-school investments over the course of the multi-year bond program.

Construction Start Year(s) 

2019: All proposed work listed below in building structure, building interiors, building systems/safety & security, school grounds, and renovations & remodels

*Timeline for Instructional Upgrades is dependent on the specific upgrades selected by our school community. More information to follow.  

Building Structure

  • Repair building structure and systems in the crawlspace
  • Replace failing exterior window and door systems

Building Interiors

  • Repair, restore or replace failing bathroom partitians
  • Replace failing countertops

Building Systems / Safety & Security

  • Replace deteriorating sewer system compenents
  • Upgrade electrical components for increased capacity and to avoid building power loss
  • Upgrade heating and cooling systems for efficiency and more consistent temperature control for comfortable
  • Install electronic card access to promote a safe and secure building
  • Relocate security panel for upgraded access
  • Upgrade emergency response system
  • Improve security camera system

School Grounds

  • Repair/restore failing sidewalks and stairs

Renovations & Remodels

  • Remodel priority items, such as ceilings, walls, floors, windows, doors, painting upgrades, paving restoration, lunch rooms, classrooms and bathrooms *Significant Renovation

Instructional Upgrades

  • Each school is provided with funding for instructional upgrades that will be determined through a collaborative process with the school and community. Categories can include furniture, technology, space modifications, safety & security upgrades and specials/electives.