Northglenn Middle School

School Stats
Student Enrollment: 
806
White: 
36.6%
Hispanic: 
53.72%
African American: 
3.72%
Asian: 
3.6%
Native American: 
1.12%
Native Hawaiian/Pacific Islander: 
0.12%
Two or More Ethnicities: 
1.12%
Percent of Students on free and reduced lunch: 
78.04%
Percent of teachers with advanced degrees: 
76%
Average years teaching experience: 
10
2013 October Count
Academic Programs
Contact Information
Address: 
1123 Muriel Dr.
Northglenn, CO 80233-3151 US
Office Phone: 
720-972-5080
Attendance Phone: 
720-972-5117
Fax: 
720-972-5119
School Hours
School Hours: 
8:30 am ~ 3:45 pm
Early Release Day: 
Wednesday
Early Release Time: 
2:15 pm
Enrollment
General Enrollment: 

Here's how the enrollment process for the Five Star District works:

  • Step 1: Check your address on our boundary locator to determine which school your student will attend. Our locator is online at
    http://www.adams12.org/en/boundary_locator.
  • Step 2: Pick up an enrollment packet at one of our school locations or download the forms from our website. You will need only one Household Information Packet and individual Student Information Packets for each student.
  • Step 3: Complete your forms and gather the necessary documentation. Documentation includes: Parent/Guardian Photo ID; Child’s Birth Certificate; Proof of Residency; Immunization Records; and prior school records.
  • Step 4: Take your completed enrollment forms and all required documentation to your student’s school.

For additional information on our enrollment process, click here.

Athletics
  • Intramural Coed Soccer
  • Intramural Coed Volleyball
  • Intramural Coed Basketball
  • Intramural Coed Flag Football
School Resources
Boundary Map: 
SchoolVIEW: 
The Colorado Department of Education's new Web site enables users to gauge school performance, access student data and learn about student achievement efforts.
Principal
Principal: 
Jennifer Edgerley
Assistant Principal: 
Jennifer Weese
Assistant Principal: 
David Weisbart
Assistant Principal: 
Teresa Andrade
2008 Bond & Mill Info
Original Construction Date: 
1961
Total Gross Square Footage: 
90,709sq. ft.
Student Enrollment: 
702
School Construction Budget: 
$574,330
Enrollment As Of: 
2007
School Repairs: 
Upgrade selected hot water pumps. Repair floor slab in F wing. Replace selected doors, frames and hardware. Replace selected interior finishes that have exceeded their useful life. Replace water line main from street to building. Repair cracked concrete paving.
Student Safety: 
Install electronic card access control. Install automatic lockout system for emergencies. Upgrade existing digital video recorder.
Classroom Technology: 
Replace obsolete computer systems and upgrade network infrastructure as necessary.
2004 Bond Info
Original Construction Date: 
1961
Total Gross Square Footage: 
90,709sq. ft.
Student Enrollment: 
788
Total Investment: 
$1,055,894
Project Status: 

Construction began at Northglenn Middle School in March 2007.  Renovation work included mechanical equipment replacement, new plumbing and gas fixtures in the science rooms, and new toilet partitions in some areas. Flooring was replaced in the art and band rooms. New band lockers were provided.  The project was substantially completed in August 2007.

Work Planned: 

Improve Classrooms and Interior Space
Walls were painted in most instructional areas, corridors, and office spaces. Vinyl flooring and vinyl clad walls were replaced or resurfaced. Ceiling tile which was stained, mismatched or damaged was replaced. Cabinets, countertops, room doors and hardware were repaired or replaced as necessary. Restroom areas were renovated as needed.  New tack strips and white boards were installed.

Information Technology
Network wiring for computers was updated and obsolete networking equipment was replaced.

Mechanical/Electrical
All heating and air conditioning systems were upgraded and repaired as necessary.  Electrical service panels and equipment were upgraded as necessary to meet current standards.

Exterior Site Work and Repair
All exterior sidewalks, driveways, parking lots, and other paved areas were repaired as necessary.