The International School at Thornton Middle

School Stats
Student Enrollment: 
702
White: 
17.66%
Hispanic: 
74.36%
African American: 
3.85%
Asian: 
2.56%
Native American: 
0.43%
Native Hawaiian/Pacific Islander: 
0.28%
Two or More Ethnicities: 
0.85%
Percent of Students on free and reduced lunch: 
88.6%
Percent of teachers with advanced degrees: 
41.56%
Average years teaching experience: 
7
2011 October Count
Contact Information
Address: 
9451 Hoffman Way
Thornton, CO 80229-3535 US
Office Phone: 
720-972-5160
Attendance Phone: 
720-972-5198
Fax: 
720-972-5199
School Hours
School Hours: 
8:30 am ~ 3:45 pm
Early Release Day: 
Wednesday
Early Release Time: 
2:15 pm
Enrollment
General Enrollment: 

Here's how the enrollment process for the Five Star District works:

  • Step 1:  Check your address on our boundary locator to determine which school your student will attend. Our locator is online at
                           http://www.adams12.org/en/boundary_locator.
  • Step 2:  Pick up an enrollment packet at one of our school locations or download the forms from our website. You will need only one Household Information Packet and individual Student Information Packets for each student.
  • Step 3:  Complete your forms and gather the necessary documentation.  Documentation includes: Parent/Guardian Photo ID; Child’s Birth Certificate; Proof of Residency; Immunization Records; and prior school records.
  • Step 4:  Take your completed enrollment forms and all required documentation to your student’s school.

For additional information on our enrollment process, click here.

Athletics
  • Intramural Coed Soccer
  • Intramural Coed Volleyball
  • Intramural Coed Basketball
  • Intramural Coed Flag Football
School Resources
SchoolVIEW: 
The Colorado Department of Education's new Web site enables users to gauge school performance, access student data and learn about student achievement efforts.
Principal
Principal: 
Jami Miller
Assistant Principal: 
Grant Underwood
Assistant Principal: 
Jason Gooding
2008 Bond & Mill Info
Original Construction Date: 
1992
Total Gross Square Footage: 
126,624sq. ft.
Student Enrollment: 
689
School Construction Budget: 
$262,290
Estimated Timeframe for Completion: 
08/2013
Enrollment As Of: 
2007
School Repairs: 
Replace selected exterior door hardware. Replace folding partition at kitchen. Replace selected interior finishes that have exceeded their useful life.
Student Safety: 
Install electronic card access control. Install automatic lockout system for emergencies. Provide visitor and volunteer tracking software. Upgrade existing digital video recorder.
Classroom Technology: 
Replace obsolete computer systems and upgrade network infrastructure as necessary.
2004 Bond Info
Original Construction Date: 
1992
Total Gross Square Footage: 
126,624sq. ft.
Student Enrollment: 
895
Total Investment: 
$1,107,958
Project Status: 

Construction began at Thornton Middle School in February 2008 on the new heating, ventilation, air conditioning and control systems.  Improvements were made to classrooms and interior space. This project is scheduled for completion by August 2008.

Work Planned: 

Improve Classrooms and Interior Space
Walls were painted in most instructional areas, corridors, and office spaces. Ceiling tile which was damaged or more than 25 years old was replaced.  Kitchen and dining areas were upgraded. New tack strips and white boards were installed.

Information Technology
Network wiring for computers was updated and obsolete networking equipment was replaced.

Mechanical/Electrical
All heating and air circulation systems were upgraded and repaired as necessary. Electrical service panels and equipment were upgraded as necessary to meet current standards.

Exterior Site Work and Repair
All exterior sidewalks, driveways, parking lots, and other paved areas were repaired as necessary.