Legacy High School

School Stats
Student Enrollment: 
2066
White: 
71.39%
Hispanic: 
16.99%
African American: 
1.89%
Asian: 
8.52%
Native American: 
0.48%
Native Hawaiian/Pacific Islander: 
0.05%
Two or More Ethnicities: 
0.68%
Percent of Students on free and reduced lunch: 
16.31%
Percent of teachers with advanced degrees: 
62.62%
Average years teaching experience: 
14
2011 October Count
Academic Programs
Contact Information
Address: 
2701 W. 136th Ave.
Broomfield, CO 80023 US
Office Phone: 
720-972-6700
Attendance Phone: 
720-972-6896
Fax: 
720-972-6897
School Hours
School Hours: 
7:15 am ~ 3:00 pm
Early Release Day: 
Wednesday
Early Release Time: 
Start: 7:10 am, End: 12:30 pm
Enrollment
General Enrollment: 

Here's how the enrollment process for the Five Star District works:

  • Step 1:  Check your address on our boundary locator to determine which school your student will attend. Our locator is online at
                           http://www.adams12.org/en/boundary_locator.
  • Step 2:  Pick up an enrollment packet at one of our school locations or download the forms from our website. You will need only one Household Information Packet and individual Student Information Packets for each student.
  • Step 3:  Complete your forms and gather the necessary documentation.  Documentation includes: Parent/Guardian Photo ID; Child’s Birth Certificate; Proof of Residency; Immunization Records; and prior school records.
  • Step 4:  Take your completed enrollment forms and all required documentation to your student’s school.

For additional information on our enrollment process, click here.

Athletics
  • Boys & Girls Cross Country
  • Football
  • Boys Golf
  • Girls Gymnastics
  • Boys Soccer
  • Softball
  • Boys Tennis
  • Volleyball
  • Boys & Girls Basketball
  • Girls Swimming
  • Wrestling
  • Baseball
  • Girls Golf
  • Girls Soccer
  • Boys Swimming
  • Girls Tennis
  • Boys & Girls Track and Field
School Resources
SchoolVIEW: 
The Colorado Department of Education's new Web site enables users to gauge school performance, access student data and learn about student achievement efforts.
Principal
Principal: 
Lee Peters
Assistant Principal: 
Brendon Feddema
Assistant Principal: 
Kylie Russell
Assistant Principal: 
Michael Baumann
2008 Bond & Mill Info
Original Construction Date: 
2000
Total Gross Square Footage: 
244,014sq. ft.
Student Enrollment: 
1,917
School Construction Budget: 
$334,555
Estimated Timeframe for Completion: 
08/2012
Enrollment As Of: 
2007
School Repairs: 
Replace selected interior finishes that have exceeded their useful life. Address south side basement drainage issues. Repair damaged concrete at loading dock and selected curb and gutter.
Student Safety: 
Install electronic card access control.  Install automatic lockout system for emergencies. 
Classroom Technology: 
Replace obsolete computer systems and upgrade network infrastructure as necessary.
2004 Bond Info
Original Construction Date: 
2000
Total Gross Square Footage: 
244,014sq. ft.
Student Enrollment: 
1,938
Total Investment: 
$706,171
Project Status: 

Legacy High School is a newer facility and was scheduled later in the bond renewal cycle.  The renovation was completed in August 2007, and the IT infrastructure upgrade is scheduled to be complete in August 2008.

Work Planned: 

Improve Classrooms and Interior Space
Walls were painted in most instructional areas, corridors, and office spaces. Ceiling tile which was damaged was replaced. New tack strips and white boards were installed.  Room signage was updated.

Information Technology
Network wiring for computers was updated and obsolete networking equipment was replaced.

Mechanical/Electrical
All heating and air circulation systems were upgraded and repaired as necessary. Air conditioning was added to areas in need.  Electrical service panels and equipment were upgraded as necessary to meet current standards.

Exterior Site Work and Repair
All exterior sidewalks, driveways, parking lots, and other paved areas were repaired as necessary.