Construction began at Cherry Drive Elementary School in February 2008 on the new heating, ventilation, air conditioning and control systems. Improvements were made to classrooms and interior space. This project is scheduled for completion by August 2008.
Classrooms received new carpet. The roof was replaced.
Project Upgrades: Classrooms got new carpet. The roof was replaced.
Playgrounds: Improvements were made in playgrounds, eliminating worn-out or hazardous equipment, and providing access to students with disabilities.
Air Conditioning: Add air conditioning.
Improve Classrooms and Interior Space: Walls were painted in most instructional areas, corridors, and office spaces. Carpet and tile more than 15 years old was replaced. Vinyl flooring and vinyl clad walls were replaced or resurfaced. Ceiling tile which was damaged or more than 25 years old was replaced. The gym floor was replaced. Cabinets, countertops, room doors and hardware were repaired or replaced as necessary. Restrooms were upgraded. New tack strips and white boards were installed.
Information Technology: Network wiring for computers was updated and obsolete networking equipment was replaced.
Mechanical/Electrical: All heating and air circulation systems were upgraded and repaired as necessary. Air conditioning was added to instructional areas. Electrical service panels and equipment were upgraded as necessary to meet current standards.
Exterior Site Work and Repair: All exterior sidewalks, driveways, parking lots, and other paved areas were repaired as necessary.
All Schools Open