Hillcrest Elementary School

School Stats
Student Enrollment: 
463
White: 
22.25%
Hispanic: 
62.85%
African American: 
2.16%
Asian: 
8.21%
Native American: 
0.65%
Native Hawaiian/Pacific Islander: 
0%
Two or More Ethnicities: 
3.89%
Percent of Students on free and reduced lunch: 
82.72%
Percent of teachers with advanced degrees: 
56%
Average years teaching experience: 
6
2013 October Count
Contact Information
Address: 
10335 Croke Dr.
Northglenn, CO 80260 US
Office Phone: 
720-972-5380
Attendance Phone: 
720-972-5398
Fax: 
720-972-5399
School Hours
School Hours: 
7:45 am - 2:30 pm
Early Release Day: 
Wednesday
Early Release Time: 
1:15 pm
Early Release (AM Kindergarten): 
11:00 am
Early Release (PM Kindergarten): 
11:00 am - 1:15 pm
AM Kindergarten Hours: 
7:45 am - 10:40 am
PM Kindergarten Hours: 
11:35 am - 2:30 pm
Enrollment
Kindergarten Enrollment: 

2014-15 School Year

Title Full-Day Enrollment
January 27 - First school day in August

Please contact the school for further enrollment information.

General Enrollment: 

Here's how the enrollment process for the Five Star District works:

  • Step 1: Check your address on our boundary locator to determine which school your student will attend. Our locator is online at
    http://www.adams12.org/en/boundary_locator.
  • Step 2: Pick up an enrollment packet at one of our school locations or download the forms from our website. You will need only one Household Information Packet and individual Student Information Packets for each student.
  • Step 3: Complete your forms and gather the necessary documentation. Documentation includes: Parent/Guardian Photo ID; Child’s Birth Certificate; Proof of Residency; Immunization Records; and prior school records.
  • Step 4: Take your completed enrollment forms and all required documentation to your student’s school.

For additional information on our enrollment process, click here.

School Resources
Boundary Map: 
SchoolVIEW: 
The Colorado Department of Education's new Web site enables users to gauge school performance, access student data and learn about student achievement efforts.
Principal
Principal: 
Judi Dauman
Assistant Principal: 
Christa Wilson
2008 Bond & Mill Info
Original Construction Date: 
1962
Total Gross Square Footage: 
50,988sq. ft.
Student Enrollment: 
443
School Construction Budget: 
$352,335
Enrollment As Of: 
2007
School Repairs: 
Repair restroom plumbing fixtures. Upgrade light fixtures with energy efficient T-8 lamps. Replace weather stripping at exterior doors. Replace selected interior finishes that have exceeded their useful life. Repair PreK-K playground.
Student Safety: 
Install electronic card access control. Install automatic lockout system for emergencies. Provide visitor and volunteer tracking software. Install security cameras and digital video recorder.
Classroom Technology: 
Replace obsolete computer systems and upgrade network infrastructure as necessary.
2004 Bond Info
Original Construction Date: 
1962
Total Gross Square Footage: 
50,988sq. ft.
Student Enrollment: 
463
Total Investment: 
$2,433,770
Project Status: 

Construction began at Hillcrest Elementary School in March 2006 on a new air conditioning system and improvements to classrooms and interior space. The project was completed August 2006.

Project Upgrades: 

All original lighting fixtures were replaced to provide a uniform and energy- efficient lighting system. An existing boiler was replaced to provide a more energy efficient and reliable heating system.

Work Planned: 

Playgrounds:
Improvements were made in playgrounds, eliminating worn-out or hazardous equipment, and providing access to students with disabilities. The playground improvement project was completed in August of 2005.

Air Conditioning:
Add air conditioning.

Improve Classrooms and Interior Space:
Walls were painted in most instructional areas, corridors, and office spaces. Carpet and tile more than 15 years old was replaced. Vinyl flooring and vinyl clad walls were replaced or resurfaced. Ceiling tile which was damaged or more than 25 years old was replaced. The floor was replaced in the gym, kitchen and cafeteria. Cabinets, countertops, room doors and hardware were repaired or replaced as necessary. Restrooms were upgraded. New tack strips and white boards were installed. Room signage was updated.

Information Technology:
Network wiring for computers was updated and obsolete networking equipment was replaced.

Mechanical/Electrical:
All heating and air circulation systems were upgraded and repaired as necessary. Air conditioning was added to instructional areas. Electrical service panels and equipment were upgraded as necessary to meet current standards.

Exterior Site Work and Repair:
All exterior sidewalks, driveways, parking lots, and other paved areas were repaired as necessary.