Northglenn High School

School Stats
Student Enrollment: 
1784
White: 
33.02%
Hispanic: 
57.85%
African American: 
3.25%
Asian: 
4.32%
Native American: 
0.62%
Native Hawaiian/Pacific Islander: 
0.11%
Two or More Ethnicities: 
0.84%
Percent of Students on free and reduced lunch: 
43.44%
Percent of teachers with advanced degrees: 
66%
Average years teaching experience: 
12
2013 October Count
Academic Programs
Contact Information
Address: 
601 W. 100th Pl.
Northglenn, CO 80260-6003 US
Office Phone: 
720-972-4600
Attendance Phone: 
720-972-4736
Fax: 
720-972-4739
School Hours
School Hours: 
7:15 am ~ 3:00 pm
Early Release Day: 
Wednesday
Early Release Time: 
Start: 7:10 am, End: 12:30 pm
Enrollment
General Enrollment: 

Here's how the enrollment process for the Five Star District works:

  • Step 1: Check your address on our boundary locator to determine which school your student will attend. Our locator is online at
    http://www.adams12.org/en/boundary_locator.
  • Step 2: Pick up an enrollment packet at one of our school locations or download the forms from our website. You will need only one Household Information Packet and individual Student Information Packets for each student.
  • Step 3: Complete your forms and gather the necessary documentation. Documentation includes: Parent/Guardian Photo ID; Child’s Birth Certificate; Proof of Residency; Immunization Records; and prior school records.
  • Step 4: Take your completed enrollment forms and all required documentation to your student’s school.

For additional information on our enrollment process, click here.

Get To Know Our School

Dear Northglenn High School Community,

Welcome to Northglenn High School. I am proud to serve the students and community of Northglenn as your principal. Northglenn is a school that is strong in tradition and values diversity. Our number one priority is our students and we focus on our student’s academic success - both now and for their future.

Our diversity is a unique strength of Northglenn High School and we take pride in the great wealth of clubs, activities and athletics that we offer our students. Being involved in a variety of activities ensures student success during high school. I encourage all students, staff, parents, and community members to become a contributing member of our school by joining in a variety of activities, participating as a volunteer, or becoming a mentor. You can find out more information about these activities on our website at: http://www.northglennhs.org/

We have great students, a capable and committed staff and the encouragement of parents and community members! Everything points to a high school career filled with dynamic learning, academic accomplishments and success in extra-curricular activities.

I look forward to meeting each and every one of you and working with you to continue our tradition of excellence together.

Sincerely,

 

Principal

Conozca a Nuestra Escuela
Estimada Comunidad de la Escuela Secundaria Northglenn,

Bienvenidos a la Escuela Secundaria Northglenn. Como directora, estoy orgullosa de servir a los estudiantes y a la comunidad de Northglenn. Northglenn es una escuela que posee una fuerte tradición y valores de diversidad. Nuestra prioridad número uno es nuestros estudiantes y nos enfocamos en el éxito académico de nuestros estudiantes tanto en el presente como en el futuro.

Nuestra diversidad es una virtud única de la Escuela Secundaria Northglenn y estamos orgullosos de la gran afluencia de los clubes, actividades y deportes que ofrecemos a nuestros estudiantes. El estar envuelto en varias actividades asegura el éxito del estudiante durante la escuela secundaria. Sugiero a todos los estudiantes, personal, padres y a los miembros de la comunidad que sean colaboradores de nuestra escuela formando parte de varias actividades, participando como voluntario, o convirtiéndose en un mentor. Puede encontrar más información sobre estas actividades en nuestra página web en: http://www.northglennhs.org/

¡Tenemos excelente estudiantes, un dedicado y capacitado personal como así también el ánimo de los padres y miembros de la comunidad! Todo apunta a una carrera en la escuela secundaria llena de aprendizaje dinámico, logros académicos y éxito en las actividades extra-curriculares.

Espero que pueda conocer a todos y cada uno de ustedes y que juntos podamos trabajar para continuar nuestra tradición y excelencia.

Atentamente,

Athletics
  • Boys & Girls Cross Country
  • Football
  • Boys Golf
  • Girls Gymnastics
  • Boys Soccer
  • Softball
  • Boys Tennis
  • Volleyball
  • Boys & Girls Basketball
  • Girls Swimming
  • Wrestling
  • Baseball
  • Girls Golf
  • Girls Soccer
  • Boys Swimming
  • Girls Tennis
  • Boys & Girls Track and Field
School Resources
SchoolVIEW: 
The Colorado Department of Education's new Web site enables users to gauge school performance, access student data and learn about student achievement efforts.
Principal
Principal: 
Sharee Blunt
Assistant Principal: 
Melissa Sivernell
2008 Bond & Mill Info
Original Construction Date: 
1965
Total Gross Square Footage: 
298,974sq. ft.
Student Enrollment: 
2,047
School Construction Budget: 
$571,968
Enrollment As Of: 
2007
School Repairs: 
Repair and refurbish selected HVAC equipment. Repair cabinet unit heaters. Install main backflow preventer. Replace selected doors and hardware. Replace selected interior finishes that have exceeded their useful life. Replace selected exterior concrete stairs and ramps.
Student Safety: 
Install electronic card access control.
Classroom Technology: 
Replace obsolete computer systems and upgrade network infrastructure as necessary.
2004 Bond Info
Original Construction Date: 
1965
Total Gross Square Footage: 
286,705sq. ft.
Student Enrollment: 
2,387
Total Investment: 
$9,199,384
Project Status: 

Construction at Northglenn High School started in February 2005 and all work was completed at the beginning of August 2005 as planned.  Additional crews began working after-school hours in March 2007 to continue renovation projects. All work was completed as scheduled in September 2007. Renovation projects included site road paving, replacement of ceiling tiles, restroom renovations, case work repair, miscellaneous lavatory replacements, miscellaneous mechanical and controls repair and replacement, electrical repairs and grounding, new clock and intercom systems, new IT equipment rooms and new wiring throughout.

Project Upgrades: 

The two mobiles were removed.  The existing resource room was relocated and the existing space was converted into two multipurpose classrooms.  A special education classroom was divided in two with an operable partition.

Countertops and sinks were replaced in the chemistry laboratory and three doors were fitted with automatic openers. A new dimming system will be installed in the auditorium.

Work Planned: 

Improve Classrooms and Interior Space
Walls were painted in most instructional areas, corridors, and office spaces. Carpet and tile more than 15 years old was replaced. Vinyl flooring and vinyl clad walls were replaced or resurfaced. Ceiling tile which was damaged was replaced. Cabinets, countertops, room doors and hardware were repaired or replaced as necessary. Restrooms were upgraded. New tack strips and white boards were installed.  Room signage was updated.

Information Technology
Network wiring for computers was updated and obsolete networking equipment was replaced. Air conditioning equipment was installed to protect computer areas.

Mechanical/Electrical
All heating and air circulation systems were upgraded and repaired as necessary. Air conditioning was added to areas in need.  Electrical service panels and equipment were upgraded as necessary to meet current standards.

Exterior Site Work and Repair
All exterior sidewalks, driveways, parking lots, and other paved areas were repaired as necessary.