Niver Creek Middle School

School Stats
Student Enrollment: 
743
White: 
23.01%
Hispanic: 
74.83%
African American: 
1.21%
Asian: 
0.67%
Native American: 
0%
Native Hawaiian/Pacific Islander: 
0.13%
Two or More Ethnicities: 
0.13%
Percent of Students on free and reduced lunch: 
89.64%
Percent of teachers with advanced degrees: 
56.6%
Average years teaching experience: 
8.81
2010 October Count
Academic Programs
Contact Information
Address: 
9450 Pecos St.
Thornton, CO 80260 US
Office Phone: 
720-972-5120
Attendance Phone: 
720-972-5158
Fax: 
720-972-5159
School Hours
School Hours: 
8:30 am ~ 3:45 pm
Early Release Day: 
Wednesday
Early Release Time: 
2:15 pm
Registration
General Registration: 

Here's how the enrollment process for the Five Star District works:

  • Step 1:  Check your address on our boundary locator to determine which school your student will attend. Our locator is online at
                           http://www.adams12.org/en/boundary_locator.
  • Step 2:  Pick up an enrollment packet at one of our school locations or download the forms from our website. You will need only one Household Information Packet and individual Student Information Packets for each student. 
  • Step 3:  Complete your forms and gather the necessary documentation.  Documentation includes: Parent/Guardian Photo ID; Child’s Birth Certificate; Proof of Residency; Immunization Records; and prior school records.
  • Step 4:  Take your completed enrollment forms and all required documentation to your student’s school.

For additional information on our enrollment process, click here.

Athletics
  • Intramural Coed Soccer
  • Intramural Coed Volleyball
  • Intramural Coed Basketball
  • Intramural Coed Flag Football
School Resources
Boundary Map: 
SchoolVIEW: 
The Colorado Department of Education's new Web site enables users to gauge school performance, access student data and learn about student achievement efforts.
Principal
Principal: 
Jacque Kerr
2008 Bond & Mill Info
Original Construction Date: 
1977
Total Gross Square Footage: 
105,247sq. ft.
Student Enrollment: 
707
School Construction Budget: 
$427,904
Estimated Timeframe for Completion: 
08/2012
Enrollment As Of: 
2007
School Repairs: 
Repair and replace selected HVAC equipment. Replace selected interior finishes that have exceeded their useful life. Repair selected concrete and asphalt paving. Replace irrigation system and controls at selected areas.
Student Safety: 
Install electronic card access control. Install automatic lockout system for emergencies. Provide visitor and volunteer tracking software. Upgrade existing digital video recorder.
Classroom Technology: 
Replace obsolete computer systems and upgrade network infrastructure as necessary
2004 Bond Info
Original Construction Date: 
1977
Total Gross Square Footage: 
105,247sq. ft.
Student Enrollment: 
898
Total Investment: 
$1,877,399
Project Status: 

Construction began at Niver Creek Middle School in February of 2007  Renovation work included the installation of new IT wiring for computers, telephones and cable TV; floor tile was removed and replaced in the corridors; science casework was replaced; sinking floors were mud-jacked to level; and the gym bleachers were repaired and the gym floor was recoated and lined.  Removal of three mobiles containing two classrooms each began at the beginning of March 2007 and was completed on schedule in September 2007.   The project was substantially completed in August 2007.

Work Planned: 

Improve Classrooms and Interior Space
Walls were painted in most instructional areas, corridors, and office spaces. Carpet and tile more than 15 years old was replaced. Vinyl flooring and vinyl clad walls were replaced or resurfaced. Ceiling tile which was damaged or more than 25 years old was replaced.  Cabinets, countertops, room doors and hardware were repaired or replaced as necessary. The kitchen floor was replaced.

Information Technology
Network wiring for computers was updated and obsolete networking equipment was replaced.

Mechanical/Electrical
All heating and air conditioning systems were upgraded and repaired as necessary.  Electrical service panels and equipment were upgraded as necessary to meet current standards.

Exterior Site Work and Repair
All exterior sidewalks, driveways, parking lots, and other paved areas were repaired as necessary.