2008 Proposed Bond Project

  • Northglenn Middle School
    Original Construction Date
    1961
    Gross Sq. Footage
    90,709sq. ft.
    Enrollment
    702
    Enrollment as of
    2007
    Construction Budget
    $574,330
    School Repairs
    Upgrade selected hot water pumps. Repair floor slab in F wing. Replace selected doors, frames and hardware. Replace selected interior finishes that have exceeded their useful life. Replace water line main from street to building. Repair cracked concrete paving.
    Student Safety
    Install electronic card access control. Install automatic lockout system for emergencies. Upgrade existing digital video recorder.
    Classroom Technology
    Replace obsolete computer systems and upgrade network infrastructure as necessary.