2008 Proposed Bond Project
Northglenn Middle SchoolOriginal Construction Date1961Gross Sq. Footage90,709sq. ft.Enrollment702Enrollment as of2007Construction Budget$574,330School RepairsUpgrade selected hot water pumps. Repair floor slab in F wing. Replace selected doors, frames and hardware. Replace selected interior finishes that have exceeded their useful life. Replace water line main from street to building. Repair cracked concrete paving.Student SafetyInstall electronic card access control. Install automatic lockout system for emergencies. Upgrade existing digital video recorder.Classroom TechnologyReplace obsolete computer systems and upgrade network infrastructure as necessary.