2008 Proposed Bond Project

  • Westlake Middle School
    Original Construction Date
    1975
    Gross Sq. Footage
    120,176sq. ft.
    Enrollment
    883
    Enrollment as of
    2007
    Construction Budget
    $558,193
    School Repairs
    Repair or replace selected HVAC equipment. Repair emergency generator and transfer switch. Replace selected doors and frames. Replace selected interior finishes that have exceeded their useful life. Repair damaged sidewalks, stairs and railings.
    Student Safety
    Install electronic card access control. Install automatic lockout system for emergencies. Provide visitor and volunteer tracking software.
    Classroom Technology
    Replace obsolete computer systems and upgrade network infrastructure as necessary.