2008 Proposed Bond Project
Westlake Middle SchoolOriginal Construction Date1975Gross Sq. Footage120,176sq. ft.Enrollment883Enrollment as of2007Construction Budget$558,193School RepairsRepair or replace selected HVAC equipment. Repair emergency generator and transfer switch. Replace selected doors and frames. Replace selected interior finishes that have exceeded their useful life. Repair damaged sidewalks, stairs and railings.Student SafetyInstall electronic card access control. Install automatic lockout system for emergencies. Provide visitor and volunteer tracking software.Classroom TechnologyReplace obsolete computer systems and upgrade network infrastructure as necessary.