2008 Proposed Bond Project
Thornton High SchoolOriginal Construction Date1974Gross Sq. Footage235,930sq. ft.Enrollment1,996Enrollment as of2007Construction Budget$1,273,344School RepairsReplace most doors and hardware. Replace selected interior finishes that have exceeded their useful life. <br /> Repair damaged sidewalks and stairs. Repair retaining wall at soccer field. Repair selected curb and gutter and concrete and asphalt paving.Student SafetyInstall electronic card access control. Install automatic lockout system for emergencies.Classroom TechnologyReplace obsolete computer systems and upgrade network infrastructure as necessary.