2008 Proposed Bond Project

  • Horizon High School
    Original Construction Date
    1987
    Estimated Timeframe for Completion
    08/2012
    Gross Sq. Footage
    279,129sq. ft.
    Enrollment
    2,118
    Enrollment as of
    2007
    Construction Budget
    $570,618
    School Repairs
    Replace selected HVAC components and upgrade walk-in cooler mechanical. Replace fire alarm monitoring cable. Address electrical and controls in main electrical room. Replace selected doors and hardware. Replace selected interior finishes that have exceeded their useful life. Address ramp area drainage.
    Student Safety
    Provide visitor and volunteer tracking software.
    Classroom Technology
    Replace obsolete computer systems and upgrade network infrastructure as necessary.