2008 Proposed Bond Project

  • Niver Creek Middle School
    Original Construction Date
    1977
    Estimated Timeframe for Completion
    08/2012
    Gross Sq. Footage
    105,247sq. ft.
    Enrollment
    707
    Enrollment as of
    2007
    Construction Budget
    $427,904
    School Repairs
    Repair and replace selected HVAC equipment. Replace selected interior finishes that have exceeded their useful life. Repair selected concrete and asphalt paving. Replace irrigation system and controls at selected areas.
    Student Safety
    Install electronic card access control. Install automatic lockout system for emergencies. Provide visitor and volunteer tracking software. Upgrade existing digital video recorder.
    Classroom Technology
    Replace obsolete computer systems and upgrade network infrastructure as necessary