Hillcrest Elementary School

10335 Croke Drive, Northglenn, CO, 80260 - 720-972-5380 - Website
Hillcrest Elementary
Project rating - 2 $2.0-$2.4M
Project rating - 2

Construction - Here we go! With the planning and design phase complete, construction is underway at your school to accomplish the individual projects of your school's investment plan.

Latest Updates

Bond improvement work will continue at Hillcrest Elementary in Summer 2020.

Work will include:

  • Renovations to art, music and physical education spaces
  • Exterior door/window renovation
  • Safety improvements including secured entry vestibule

Bond improvement work took place in Summer 2019 and included:

  • Minor upgrades to the existing K-5 playground and blacktop area
  • Replacement of deteriorating concrete sidewalks for safety and ADA accessibility
  • The reconstruction of the existing northeast asphalt parking lot
  • Roof replacement

Construction Start Year(s) 

2019: roof and skylight replacement, Playground upgrades as listed below in equipment & furnishings, and walkway repairs as listed below in school grounds - COMPLETED 

2020: Exterior doors and windows work as listed below in building structure; safety & security as well technology upgrades as listed below in building systems/safety & security and all work listed below in renovations & remodels

2021: Crawlspace work as listed below in building structure and plumbing work as listed below in building systems

Building Structure

  • Replace roof section and repair/restore additional sections to extend service - COMPLETED 
  • Repair building structure and systems in the crawlspace
  • Replace failing skylight systems- COMPLETED 
  • Repair, patch and paint exterior doors and windows to extend service life

Equipment & Furnishings

  • Upgrade playground- COMPLETED 

Building Systems / Safety & Security

  • Install electronic card access to promote a safe and secure building
  • Replace deteriorating sewer system components
  • Replace failing water lines
  • Install digital security camera system

School Grounds

  • Repair/restore failing sidewalks and stairs- COMPLETED 

Renovations & Remodels

  • Repair or replace specials (music, art, gym) program components such as wall panels, ceiling tiles, flooring and program specific equipment- COMPLETED 

Instructional Upgrades

  • Each school is provided with funding for instructional upgrades that will be determined through a collaborative process with the school and community. Categories can include furniture, technology, space modifications, safety & security upgrades and specials/electives- COMPLETED