Northglenn High School

601 W. 100th Place, Northglenn, CO, 80260 - 720-972-4600 - Website
Northglenn High Building 2016
Project rating - 2 $9.8-$11.5M
Project rating - 2

Construction - Here we go! With the planning and design phase complete, construction is underway at your school to accomplish the individual projects of your school's investment plan.

Latest Updates

A second phase of bond improvement work at Northglenn High School is taking place in Summer 2019. 

Work includes:

  • Conversion of existing space to add two more classrooms and help reduce class sizes as school enrollment continues to increase
  • Two brand new residential kitchens to support school's catering pathway
  • Major improvements to Fine Arts classrooms (ceramics, drawing and painting, and band/orchestra room)
  • Major improvements in school auditorium

The first phase of bond renovation work at Northglenn High School completed in Summer 2018 included a renovation to the school cafeteria and kitchen; the installation of a large artificial turf field to replace a natural grass field; concrete repair work at the football field; structure repair in the breezeway connecting the main building and the STEM Building and flooring, lighting and ceiling improvements in the Little Theater space.


News Updates

Northglenn High cafeteria to get new look over Summer 2018 - May 2018


Construction Start Year(s) 

2018/2019: All proposed work listed below in building structure [minus the roof replacement], building systems/safety & security, school grounds, and renovations & remodels

2021: Roof replacement as listed below in building structure


Project Team

ArchitectEidos Architects

Contractor: Haselden Construction

Building Structure

  • Replace roof section and repair/restore additional sections to extend service life
  • Repair building structure and systems in the crawlspace
  • Replace access stairs and ramps to mobile classrooms
  • Replace failing exterior windows and doors

Building Systems / Safety & Security

  • Improve cafeteria/kitchen plumbing components - COMPLETED SUMMER 2018
  • Replace deteriorating sewer system components
  • Replace heating and cooling system components for comfort and increased reliability
  • Upgrade electrical components to avoid building power loss and learning disruptions
  • Upgrade fire alarm control system
  • Upgrade emergency response system
  • Improve security camera system

School Grounds

  • Realign student parking for safer traffic flow
  • Repair/restore failing sidewalks and stairs - COMPLETED SUMMER 2018
  • Convert space for multipurpose turf field in Norse Park - COMPLETED SUMMER 2018

Renovations & Remodels

  • Remodel priority items, such as ADA accessibility, ceilings, walls, floors, windows, doors, painting upgrades, paving restoration, lunch rooms, classrooms and bathrooms *Significant Renovation
  • Repair or replace arts program items such as easels, pottery wheels, kilns, drafting/drawing stools, airbrush stations, group work stations and A/V systems
  • Repair or replace theater and music program items such as instrument storage, practice rooms, risers & platforms, acoustic enhancements, auditorium components and A/V systems
  • Significant renovations to Five Star Stadium to address safety and ADA accessiblity impacting all high schools

Instructional Upgrades

  • Each school is provided with funding for instructional upgrades that will be determined through a collaborative process with the school and community. Categories can include furniture, technology, space modifications, safety & security upgrades and specials/electives.